Homepage|Business Center|Save the Page|Get the App
普通会员

Shandong Hengwang Group Co., Ltd.

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > Solar Crawler Hydraulic Photovoltaic Guardrail Post Pile Driver
Solar Crawler Hydraulic Photovoltaic Guardrail Post Pile Driver
Click on the image to view the original image
Product: views:6Solar Crawler Hydraulic Photovoltaic Guardrail Post Pile Driver 
Branch: HW
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2019-10-17 05:39
  Negotiated
Product Details
Overview
Quick Details
Piling Speed(m/min):
3m
Efficiency:
85kw, High
After-sales Service Provided:
Video technical support, Online support, Free spare parts, Field installation, commissioning and training, Field maintenance and repair service, No after-sales service, Engineers available to service machinery overseas
Warranty:
1 Year
Condition:
New
Place of Origin:
Shandong, China
Brand Name:
HW
Weight:
5.8ton
Dimension(L*W*H):
4600*2150*2800mm
Certification:
ISO9001
Pile length:
3m
wheel track:
1620mm
Hydraulic system:
230L/Min
Pile diameter:
114-220mm
Pile hydraulic hammer weight:
230kg
Rated system pressure:
20Mpa
Supply Ability
Supply Ability:
50 Set/Sets per Month
Packaging & Delivery
Packaging Details
naked packing for road construction highway guardrail hydraulic small pile driver
Port
Qingdao, Shanghai, Tianjin, Dalian,
Lead Time:
Quantity(Sets)1 - 20 >20
Est. Time(days)10To be negotiated
询价单
total0items  Comments