Homepage|Business Center|Save the Page|Get the App
普通会员

Xingning Green Lantern Optoelectronic Light Factory

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > Hot Sell AC to DC Adapter 12V2A 24W Switching Power Supply with switch on and off on wire
Hot Sell AC to DC Adapter 12V2A 24W Switching Power Supply with switch on and off on wire
Click on the image to view the original image
Product: views:5Hot Sell AC to DC Adapter 12V2A 24W Switching Power Supply with switch on and off on wire 
Branch: Greenlantern
Size: 15X12X10 cm
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2019-10-17 04:10
  Negotiated
Product Details
Overview
Quick Details
Place of Origin:
Guangdong, China
Brand Name:
Greenlantern
Model Number:
12V 1a
Output Type:
AC
Connection:
Desktop

Packaging & Delivery

Selling Units:
Single item
Single package size: 
15X12X10 cm
Single gross weight:
0.12 kg
Package Type:
strong export standard carton box
Lead Time:
Quantity(Set)1 - 1000>1000
Est. Time(days)5To be negotiated

Hot Sell AC to DC Adapter 12V2A 24W Switching Power Supply with switch on and off on wire

 

Product Description
Name:White body adapter 12v 2a ac/dc power adaptor
Input Voltage:AC 100-240V 
Output Voltage:DC 12V  2A     
Frequency range:50/60Hz
DC connector size:

/

Product Dimension:

80*82*28mm

Length of DC cable:0.9m (normal type) /1.2m/1.5m/1.8m/2m/3m
Conversion efficiency: 80%
Ripple & Noise:(mVp-p): < 1%
Line Regulation:± 0.5% max
Load Regulation:± 1% max
Temperature coefficient:± 0.03% (0 ~ 50°C)
Start time: 3s (240VAC input, io=100%)
Guard time: 20ms (240VAC input, io=100%)
Protection:Over current/Over voltage/Short circuit protection
Working temperature: -10°C ~+ 40°C

 

Storage temperature: -40°C ~ +70°C
Humidity:10% ~ 90% RH

 

Detail Images



 

 
Feature
 
 

Four advantages More stable, more secure, more efficient.

1. Stable New IC Plan
    The integrates circuit board and timing circuit generates clock rate unconditionally.
    And the rate is regular and stable.

2. PMW Radiation
    The time ratio of the switch is controlled by PWM to maintain stable output, so that the power of the power          supply is small and efficiency is high.

3. Reduce Radiation
    The EMC circuit system is improved to protect the equipment from electromagnetic interference, reduce              radiation and protect the equipment.

4. Improve Power Availability
    The PFC circuit is designed to maximize power utilization.

 

Applications

 
Related Products
 
Certifications
 
 
 
Company Information

Green Lantern is a professional high-tech manufacturer in producing outdoor led lighting solution .We specialize in exploiting, researching, manufacturing and selling outdoor lighting.Our products mainly contain led street light,led flood light,led solar light,,led high bay light and so on.

 

 
 
Why Choose Green Lantern ?
 

1.Patent design,which means a huge market.

2.If you are the new start company,you get a big business chance but don"t know what to do?

  Green lantern have so many professional engineers,they will help you design it,make the light   simulation,offer all the information that your customer need,also our engineers can  go to your country if necessary.

3.We are the manufacturer,we custom-make any design for you.

4.Are you still worry after payment supply disapear and you can"t get the goods?

 Don"t worry,Green lantern is the a member of Trade Assurance service in Alibaba, protect

 buyers’ payment to suppliers,and to ensure suppliers fulfill their obligations regarding order delivery 

time and product quality.

5.Lifespan 100000hours,3 years warranty,for any quality issue within 3years,Green Lantern will cover all the cost.

 RFQ

Q1:What is the warranty for our lamps?
A1:For the lamps,we have 3 to 5years warranty.

Q2:How do you ensure the quality
A2: We get three QC processes:1.For raw materials;2.During the half of production; 3.Final QC test one by one after aging 12 hours.

Q3:How to do if any quality problems on our side in the warranty time?
A3: First, take pictures or videos as proof and send to us.We will replace new ones for free.

Q4:OEM OR ODM accepted?
A4:Yes,we can do OEM & ODM,logo on the light or package both are available.

Q5:Can we get support if we have our own market position?
A5:Please inform us your detailed market demand,we will discuss and propose helpful suggestion for you,to find the best solution for you.

Q6:Is there any cheap shipping cost to import to our country?
A6:For small order,express will be the best.And for bulk order,sea ship way is best but take much time.For urgent orders,we suggest via air to airport.

Q7: How many days will samples be finished?And how about the mass production?
A7: Generally 5-7 days for samples making. The leading time of mass production will depend on the quantity.

Q8:What is your trade assurance?
A8:100% product quality protection
100% product on time shipment protection
100% payment protection for your covered amount

 

 Our Service
 

1. For all your inquires about us or our products, we will reply you in details within 24 hours.

2. We own well-tranied and passional sales & after- sale services who can speak fluent Engligh language.

3. We offer OEM services. Can print your own logo on product , can customize the retail box packing and other things.

4. Shipping port: Shenzhen, China mainland.

5. Discouts are offered based on order quantities.

 Packaging and Shipping
 

 

 

Green Lantern save energy for you,

Your satisfaction is our inspiration !

询价单
total0items  Comments