Homepage|Business Center|Save the Page|Get the App
普通会员

Jining Hengwang Mining Machinery Co., Ltd.

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > Mini Flood Prevention Control Pile Driver With Air Compressor
Mini Flood Prevention Control Pile Driver With Air Compressor
Click on the image to view the original image
Product: views:3Mini Flood Prevention Control Pile Driver With Air Compressor 
Branch: HWGK
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2019-10-16 20:26
  Negotiated
Product Details
Overview
Quick Details
Piling Speed(m/min):
1-2m/min
Efficiency:
High Efficiency
Condition:
New
Place of Origin:
China
Brand Name:
HWGK
Model Number:
FX Series
Weight:
Customized
Dimension(L*W*H):
Customized
Certification:
ISO9001
Product Name:
Flood Prevention Pile Driver
Impact Force:
200KG-700KG
Air Consumption:
0.4-1 m3/min
Working Pressure:
0.6MPa
Timber Pile Diameter:
≤ 200mm
Steel Tube Diameter:
≤ 250mm
Pile Pressing Depth:
≤2m
Working Geology:
Rivers And Lakes Pond Embankment (Homogeneous Soil)
After-sales Service Provided:
Engineers available to service machinery overseas
Supply Ability
Supply Ability:
500 Set/Sets per Month Flood Prevention Pile Driver
Packaging & Delivery
Packaging Details
Export Standard Packing
Port
Qingdao Port
Lead Time:
Within 7 days
Product Description

Flood Prevention Pile Driver has power source, exciter, and connect the power source, the shaker drive shaft composed of three parts. New structure, small size, light weight, easy operation, strong mobility, from the power supply environment. Not only can the vertical piling, but also oblique. Compared with manual piling, the labor intensity is low and the working efficiency is high. Instead of manual piling, the piling work of flood control is realized.


Application Areas:

It is used to intercept embankment breach, wave berm, grab high dike top, grab the embankment collapse, reinforcement embankment. Is a new type of special for flood season flood control, before and after the flood dike reinforcement maintenance, rivers and lakes embankment piling machinery. It not only replace the current manpower ramming the operation, reduce labor intensity of labor, improve the efficiency of piling, and the realization of the flood control piling mechanization.

Technical Parameter
Model
FX-S
FX-M
FX-L
Impact Force
200kg
400kg
700kg
Air Consumption
0.4m3/min
0.8m3/min
1m3/min
Working Pressure
0.6MPa
0.6MPa
0.6MPa
Pile Diameter
Timber Pile
≤ 100mm
≤ 150mm
≤200mm
Steel Tube
≤ 140mm
≤ 200mm
≤ 250mm
Pile Pressing Depth
≤2m
≤2m
≤2m
Working Geology
Rivers And Lakes Pond Embankment (Homogeneous Soil)
Detailed Images
Shipment
FAQ


Q: Are you trading company or manufacturer ?
A: We are factory.


Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: What is your terms of payment ?
A: Payment <=10000USD, 100% in advance. Payment >=10000USD, 50% T/T in advance ,balance before shippment.

About us
Contact Ways

 

 

Mr. Klaus


Jining Hengwang Mining Machinery Co., Ltd
Skype : ns2768
QQ: 2853024701
Tel:86-0537-2581138
Mob / Wechat / Whatsapp: +86-13563796657

询价单
total0items  Comments