Homepage|Business Center|Save the Page|Get the App
普通会员

Shenzhen YHD Electronic Co., Ltd.

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > Cheapest price solar led street lighting with sensor motion
Cheapest price solar led street lighting with sensor motion
Click on the image to view the original image
Product: views:6Cheapest price solar led street lighting with sensor motion 
Type: Solar Street Light
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2019-10-17 03:53
  Negotiated
Product Details
Overview
Quick Details
Type:
Solar Street Light
Model Number:
SSL-20 solar street lighting
Solar panel:
18v80w
Battery:
Lithum-ion 33ah
Lums:
6000-6600lm
color temperature:
6000k
Charging time:
About 6 hours
Working time:
About 30 hours
Installation height range:
7-9M
Working tem.:
'-30℃~+70℃
Angle lighting:
120 degree
Product name:
solar street lighting
Supply Ability
Supply Ability:
15000 Set/Sets per Month solar street lighting
Packaging & Delivery
Packaging Details
1200*380*160mm
22kgs
1
1230*460*230mm
25.5kgs
280sets/620sets
Port
Shenzhen
Lead Time:
Quantity(Sets)1 - 500 >500
Est. Time(days)15To be negotiated

Cheapest price solar led street lighting with sensor motion

Product Description

solar street lighting

1,8w~60w solar panel
2,6000-6600lm
3,Working time(Full power mode):15hours

 

ModelMTO-SSL20-AMTO-SSL25-AMTO-SSL30-AMTO-SSL40-AMTO-SSL50-AMTO-SSL60-A
Solar panel18v40w18v50w18v30w18v60w18v70w18v80w
BatteryLithum-ion 18ahLithum-ion 21ahLithum-ion 24ahLithum-ion 27ahLithum-ion 30ahLithum-ion 33ah
Light source20W25W30W40W50W60W
Lums2000-2200lm2500-2750lm3000-3300lm4000-4400lm5000-5500lm6000-6600lm
color temperature 6000k
Charging timeAbout 7 hoursAbout 7 hoursAbout 6 hoursAbout 6 hoursAbout 6 hoursAbout 6 hours
Working time
(power saving mode)
About 40 hoursAbout 30 hoursAbout 30 hoursAbout 30 hoursAbout 30 hoursAbout 30 hours
Working time
(Full power mode)
About 20 hoursAbout 15 hoursAbout 15 hoursAbout 15 hoursAbout 15 hoursAbout 15 hours
Installation height range5-6M6-7M7-8M7-8M7-9M7-9M
Working tem. -30℃~+70℃
Angle lighting 120 degree
Production size920*330*140mm1170*330*140mm1170*330*140mm1170*330*140mm1200*380*160mm1200*380*160mm
N.W./set12.5kgs16kgs16.5kgs17kgs21kgs22kgs
Qty/ctn111111
Carton dimension950*410*210mm1210*410*210mm1210*410*210mm1210*410*210mm1230*460*230mm1230*460*230mm
G.W./ctn15kgs18.5kgs19kgs20.5kgs24.5kgs25.5kgs
20ft/40ft container loading375sets/792sets300sets/660sets300sets/660sets300sets/660sets280sets/620sets280sets/620sets
Conditions and terms:
-Trade terms:Exw price
-Lead Time: 20 days
- Payment Term: T/T 50% downpayment, T/T 50% the balance before delivery
- Warranty: 2 years
- The above quotation is valid within one month

 

solar street lighting

 

 

 

 

 

 

 

 

 

 

Packaging & Shipping

 solar street lighting

Production size920*330*140mm
N.W./set12.5kgs
Qty/ctn1
Carton dimension950*410*210mm
G.W./ctn15kgs
20ft/40ft container loading375sets/792sets

 

solar street lighting

 

 

 

 

 

 

Our Services

1.  Quick Response, all your questions will be answered within 24 hours. Our motto is: "Quality first, Customer utmost". 

2.  any your customized concept we can help you to design and put into product.

 

3.  Sample order in small quantity is acceptable.

 

4.  We have professional sales team, who is not only a replier but also a problem solver, we always give customers the most feasible marketing suggestions according to their own market mode.

 

5. Every model of the products gets through strict manufacturing management process, in order to guarantee the quality of product.

 

6.We also have our professional QC Department, we will take the samples to check again before the shipment, try our best to control the ratio of  the reject lowest.

 


 

 

Company Information

 Mindtech is a manufacturer of solar energy systems, solar lanterns, solar charger, LED bulb lamps, led down lights, Led strips, Led tubes, led spotlights, led flood light and led flashlights in China who have been in this field for years. Our products have achieved CE, RoHs, Fcc certificates, You are also welcomed to test our lights as sample first about the quality. Please feel free to contact us for additional information.

 

 possess professional research and development team of more than 5 employees which is lead by senior engineers. And there are hundreds of employees in our factory. Our Factory Mindtech Optoelectronic Limited. Donglian Industrial Zone, Kengzi Road, Pingshan New District, Shenzhen, Based on the superior geographical position, we are thinking more for our customers.

 

     We offer high quality products and reasonable prices to our esteemed partners, willing a good cooperation with you in the near future!

 

 

 

FAQ

1. Q: Are you a factory or a trading company?
A: We are a factory with more than hundreds of employees. Welcome OEM and ODM, 5 employees which is lead by senior engineers are services for you.

 

2. Q: What"s the scale of your factory? And what is the annual capacity production of your company?
A: The factory building covers an area of 800 square meters, and annual output exceeds 800 million, , all products exported abroad.

 

3.Q: The cables that comes with the system would be standard, can they be extended in case there is the need

A: yes, we can make the length of cable according to your requirement, but there is a cost increased accordingly.

 

4. Q:Are the bulbs used are specially made or any normal LED bulb could be used

A: It is applied for DC12V bulbs, the output current is not over 3A for total loading bulbs. If you have DC12V bulbs, you can replace the current ones

 

5. Q: Should all the bulbs be of the same wattage (w)

A: No, you can use different types, but make sure that the output current is not extent over 3A. 

 

6. Q:When it is being charged during the day with solar panel, can the AC output be used

A: The electric appliances can be used during charging, but please make sure there are power enough inside to run the appliances.

 

7. Q: After the battery is dead, how do you replace it?

A:For replacing battery, please open the top housing, replace a new battery, please note, please connect the cable in CORRECT color, that means Red cable connect to the Red terminal on the battery, Black cable to the Black terminal. Otherwise the PCBA will be burned. Thanks! 

 

8. Q: The cables are standard, 5m- how do you extend the cables, ones you have received the system and you found that one or two of the rooms would need extra length to reach that room? Can you put extension cable between the bulb and the box?

A:Yes, of cause we can add extension cable in case of consumer requires more length. Our standard length is 5m, we can add another cable to connect the current 5m cable.

 

 

 

 

 

询价单
total0items  Comments