3. Cooperation with cloud platform and can check the inverter status
Product Description

High Power
Max DC voltage 1100v, max power 125kw
High Efficiency
Max efficiency 99.04%, 3/4 channels MPPT
High Reliability
80k-125k smart air cooling, night PID module, compatible with bifacial PV modules

Lightning protection
Provide full range of lightning protection , reliable under/over voltage protection

Compact Structure
 Easy for installation and maintenance

Friendly to environment
Provide clear and green energy ,Photovoltaic power generation, save electricity costs
Details Images

Model  | BSM80K-BHV  | BSM125K-BHV  | ||||||||
DC Input  | Max. DC Voltage  | 1100V  | ||||||||
MPPT Voltage Range  | 250V ~ 1000V  | |||||||||
Max. Input Current of Each MPPT  | 39A/52A  | 65A  | ||||||||
Number of DC Inputs  | 14  | 20  | ||||||||
MPPT Number  | 4  | |||||||||
AC Output  | Rated Output Powr  | 80kW  | 125kW  | |||||||
Max. Active Power (cos0=1)  | 88kW  | 137.5kW  | ||||||||
Rated Output Voltage  | 500V (Three Phase)  | |||||||||
Operating Voltage Range  | 500V±10%  | |||||||||
Rated Output Current  | 92.4A  | 144A  | ||||||||
Max. Output Current  | 101.6 A  | 158.8A  | ||||||||
Rated Grid Frequency  | 50Hz/ 60Hz  | |||||||||
Power Factor  | 0.8 (Leading) -0.8 (Lagging)  | |||||||||
THD  | <3%  | |||||||||
System Parameters  | Max. Efficiency  | 99.03%  | 99.04%  | |||||||
European Efficiency  | 98.53%  | 98.54%  | ||||||||
Protection Level  | IP65  | |||||||||
Operating Temperature Range  | -25°C~+60°C  | -40°C-+60°C  | ||||||||
Cooling System  | Smart Air Cooled  | |||||||||
Standby Power Consumption  | <5W  | |||||||||
Topology Structure  | Transformerless  | |||||||||
Operating Altitude  | 5000m (Derating above 4000m)  | |||||||||
Display  | LED Indicator +APP  | |||||||||
Communication  | RS485 /WiFi/GPRS  | |||||||||
Certification  | IEC62109 / IEC61000 / IEC62116 /IEC61727 / EN50S49 / CQC / CGC  | |||||||||

Monitoring Equipment

3. Cooperation with cloud platform and can check the inverter status

Certifications

Our Project

12MW Dalian Roof-top PV project in China

Ukraine 15MW solar plant

CNNC 2.8MW PV project in Weihai, China

Roof-top PV project in Anhui Province, China

String photovoltaic project in Shandong Province, China

50 KW String inverter project in China

China 500 KW solar project
Payment
Payment Term  | T/T  | EXW  | 30% T/T in advance, paid the balance before shipment  | ||
FOB  | |||||
CNF  | 30% T/T in advance, paid the balance against copy of B/L  | ||||
CIF  | |||||
L/C  | L/C amount above 50,000 usd, we can accept L/C at sight  | ||||
West Union  | Amount lower than 5000usd  | ||||
Delivery Time  | 7~10days after receiving payment for one container  | ||||
Gloable Exhibition





