Homepage|Business Center|Save the Page|Get the App
普通会员

Shenzhen Victory Lighting Co., Ltd.

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > High Quality T8 Led Tube 1200mm 4ft G13 Led Tube Lights
High Quality T8 Led Tube 1200mm 4ft G13 Led Tube Lights
Click on the image to view the original image
Product: views:8High Quality T8 Led Tube 1200mm 4ft G13 Led Tube Lights 
Branch: Victory
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2019-12-03 17:39
  Negotiated
Product Details
Overview
Quick Details
Warranty(Years):
3
Input Voltage(V):
AC100-277V
Lamp Luminous Efficiency(lm/w):
120
CRI (Ra>):
80
Working Temperature(℃):
-20 - 50
Working Lifetime(Hour):
50000
Lamp Body Material:
Aluminum Alloy
IP Rating:
IP44
Certification:
CE, ETL, RoHS
Place of Origin:
Guangdong, China
Brand Name:
Victory
Model Number:
T8
Application:
Residential, store, market, office, house etc.
Light Source:
LED
Product Name:
4ft G13 Led Tube Lights
Frequency:
50HZ-60HZ
Size:
1216x26x26mm
PC Cover:
Clear / Frosted / Stripy
Weight:
254g
Beam angle:
120 degree
Color Temperature:
3000K--6500K
Power Factor:
0.90
Housing Material:
Aluminum Alloy+PC
Item Type:
Tube Lights
Supply Ability
Supply Ability:
10000 Piece/Pieces per Week 4ft G13 Led Tube Lights
Packaging & Delivery
Packaging Details
25pcs in a standard carton
Port
Shekou / Yantian

 

High Quality T8 Led Tube 1200mm 4ft G13 Led Tube Lights

                               

 

 

 

Product Description

Specifications 

Led Tube Lights                               

 

PowerWYP718-18WSize 1216x26x26mm
MaterialAluminum Alloy+PCColor Temperature3000K--6500K
Lumens100 lm/WPower factor>0.90
Base with bracket Weight254g
Applicationoffice;factory;room;
supermarket;school etc
VoltageAC100-277V
CRI80PC CoverClear;Stripy;Frosted
Warranty3 YearsLifespan≥50,000 hrs

 

 Product details

 

Packaging & Shipping

We ship goods by UPS/DHL/FEDEX/TNT express which takes 3~ 7 working days to arrive, or by air cargo which takes about one week to arrive , or by sea which takes about one month to arrive , depending on your actual requirements.

You can pay by Bank Transfer, Western Union, Paypal or Aliexpress etc.

 

 

 

Product Uses

  Replacemetn for conventional fluorescent tubes:
1. Hotels
2. Conference/meeting room
3. Commercial Complexes
4. Residential/Institution Buildings
5. Schools, colleges & Universities
6. Hospitals General lighting, Commercial lighting, plant growing lighting.
7. Refrigeratory, Freezer
8. Advertisement box.etc.


 

 

Company Information

About us

Victory Lighting is dedicated to provide high quality and durable lighting product for customer with very reasonable price. Our products is mainly focus on LED outdoor lighting (LED streed light, LED high bay light, LED flood light and Canopy light), LED indoor lighting (LED panel light, LED T5 tube light, LED T8 tube light, LED T10 tube light, LED bulb, LED spotlight and LED ceiling light). Every product from Victory Lighting is managed by ISO9001, the product also gained CE and RoHS. We also pay a great attention to customer service that win a high reputation for our business. Welcome to visit our factory in China.

 

 

 

Our Services

1. Any of your enquiry about us or our products will be replied quickly in detail in 24hours

2. Experienced and passionate staffs are ready to answer all your enquires in fluent English without barriers

 

3. OEM&ODM, we can help design and product your own lighting

 

4. Protection of your sales area, ideas of design and all your private information 

 

Our Certificate

FAQ

Q1: What products you main business?  

A1: We Specializing in led tube light, led canopy light, led flood light, led street light, led high bay light, led ceiling light etc.

 

Q2: What certificate you got already?

A2: led flood light( CE ROHS certificate and LM-79 Report , UL is pending); led canopy light (CE ROHS certificate and LM-79 Report ); led street light(CE ROHS certificate); led tube light(CE ROHS DLC certificate);  led ceiling light(CE ROHS  certificate).

 

Q3: How about your quality?

A3: Victory Lighting use top quality material to make sure stable quality and enough brightness, we supply high cost performance products. Every product passed aging test well then delivery to every client.

 

Q4: How long the wattanty?

A4: We supply 2-5 years warranty. Once you find quality problem from our company  during warranty period, please supply us pictures or video to confirm, if it"s our quality problem, we will send you relacement, don"t undertake shipping cost.

 

Q5: How large your factory?

A5: 1500 Square meters

 

Q6: How long for the delivery time?

A6: For led flood light, led canopy light, led street light, led high bay light and led bulb delivery time within 7 working days after receive payment. For led tube light delivery time within 10 working days after receive payment. Bulk order depends on quantity.

 

Q7: How to place an order?

A7: After confirm all information with you, we will email you performa invoice, please make make payment through Bank Transfer, Paypal or Western Union and email us bank slip. We will finish production on time, and dispatch goods soon. We will tell you tracking no. and follow it every day till you recieve goods.

 

Welcome your inquiry!

 

 

询价单
total0items  Comments