About electric aerial working platform

   date:2020-10-27     browse:9    comments:0    

Electric aerial working platform is widely used for high-rise building, ensure safe in operation is most important, meantime, construction environment setting determines the safety.

In case of a dim or foggy climate, the construction site should be equipped with lighting or dazzling lights, communication and fire fighting facilities, and the fire exit. Construction site should be separated from other systems under construction and have lighting protection and grounding protection. The storage place should take measures to be protected from wind, rain and frost. The qualified parts should be stored in warehouse.

Before install aerial working platform, eliminate all the insecurity element. After construction is done, the electric power should be cut off before remove suspended working platform.  Remove steel wire rope into a roll tightly, so is the cable.


 
Article Source: About electric aerial working platform
reward
 
More>Related News
0 itemsComments

Recommended Articles
Recommended News
Browse Ranking

Links