How long does it take to set up the floating water park on water?

   date:2020-10-27     browse:2    comments:0    
Summary:The set up time depends on the number and size of the products as well as the number of set up labors. For example, if the anchors are in place, a 100 capacity park takes 1-2 days for 6 persons.

The set up time depends on the number and size of the products as well as the number of set up labors. For example, if the anchors are in place, a 100 capacity park takes 1-2 days for 6 persons.


 
Article Source: How long does it take to set up the floating water park on water?