How long it will take for OEM processing?

   date:2020-10-27     browse:5    comments:0    
Summary:It will take longer period to manufacture roof rack cross bars you need compared to the regular one. Before producing, we need to make sure the smooth communication...
It will take longer period to manufacture roof rack cross bars you need compared to the regular one. Before producing, we need to make sure the smooth communication including detailed OEM flow, so that makes it more efficient. After signing the contract, we need to confirm the material, design and sample with customers, then we can conduct the bulk production.
ShenHao Array image191
Over the years, Foshan Shunde Shen Hao Industry Co.ltd has experienced a rapid development for its roof rack cross bars by strong capability of roof rack systems. The rear bumper protector series is available in a wide range of types and specifications. During the designing stage of ShenHao roof rack systems, sketches and CAD technique are used by the designers who strive to create a product with the function of foot orthopedic. With an elegant contour, the product can refresh the car. The product will not have a chemical reaction with its sealed medium. During the designing stage, it is exclusively designed to be compatible with its sealed mediums. The product is easy to install without any special tools needed.
ShenHao Array image191
We believe in the inherent worth and dignity of those we work with and serve. As a result, we value them as partners and work together to bring about lasting change.

 
Article Source: How long it will take for OEM processing?
reward
 
More>Related News
0 itemsComments

Recommended Articles
Recommended News
Browse Ranking

Links