How long it will take for OEM processing?

   date:2020-10-27     browse:6    comments:0    
Summary:It will take longer period to manufacture copper foil roll you need compared to the regular one. Before producing, we need to make sure the smooth communication...
It will take longer period to manufacture copper foil roll you need compared to the regular one. Before producing, we need to make sure the smooth communication including detailed OEM flow, so that makes it more efficient. After signing the contract, we need to confirm the material, design and sample with customers, then we can conduct the bulk production.
LeadWin Array image142
Ningbo LeadWin International Trade Co.,Ltd is regarded as an indispensable provider of fr4 epoxy. We have earned a wealth of experience in designing and manufacturing. copper clad board is one of LeadWin's multiple product series. LeadWin electrolytic copper foil undergoes rigorous quality analysis once it is produced. It will be checked in a comprehensive way in terms of its fiber quality, water repellency, snagging resistance, moisture permeability, etc. It is a product well recognized at the 2019 CPCA (Shanghai) Exhibition. The product can emit white light which approximates to daylight. Its white light is formed by combining blue-ray with fluorescent power, or by enclosing different chips of different colors. This product is patented thanks to our 12 years of experience in R&D.

LeadWin will strive to become one of the world's top brand in the sales volume of copper clad board. Inquire!

 
Article Source: How long it will take for OEM processing?
reward
 
More>Related News
0 itemsComments

Recommended Articles
Recommended News
Browse Ranking

Links