Key points to assemble and disassemble construction hoist material lift

   date:2020-10-27     browse:5    comments:0    

When assembling construction hoist material lift, it must follow construction plan, keep the gondola platform covers the entire working surface, leaving no space to ensure safety.

Then control the entrance of equipment, it must be the consistent of equipment and scheme, also no mix up with different types. Meantime, it is necessary to strengthen the monitoring of the installation and check the assembled the building hoist goods elevator.

In addition, all staffs should be trained on safety measures, and daily management of gondola platform should have a good control. Also the disassembly can not be ignored when project finishes.


 
Article Source: Key points to assemble and disassemble construction hoist material lift
reward
 
More>Related News
0 itemsComments

Recommended Articles
Recommended News
Browse Ranking

Links