First check suspension mechanism system, counter weight, working wire rope and safety wire rope, if there is not conform to the standard, it should correct immediately.
Check the mechanical equipment and electrical equipment of the steel qire rope suspended platform, both should be able to work normally, the electrical equipment should have reliable grounding facilities.
To start the hanging platform for empty operation, repeatedly lifting, check the lifting mechanism, safety lock, limit switches, brake and motor , make sure that all can work normally,then the suspended working platform canbe used. In winter construction areas, it is necessary to clean up the dust, garbage, snow and ice in the hanging basket before operation.
It is strictly prohibited to operate on the electric hanging platform after drinking, and no joking or playing in the hanging platform. The materials and tools carried on the platform must be placed in a flat position. Overload and tilt are not allowed.
Do not work in severe weather with rain and snow or when the wind force exceeds grade 5. After 1000h of accumulative use of the safety lock, periodic inspection and re-calibration must be carried out to ensure its safe operation. In case of abnormal sound or fault during operation, the electric suspended platforn must be stopped immediately for inspection, and shall not be used before the fault is completely eliminated. If the lifting platform is used for electric welding, wire rope should be fully protected, and it can not be used as a conductive body.
Clean the hanging platform and hang it 3m off the ground, then cut off the power. During the service period, special personnel should be designated to be responsible for safety and inspection and maintenance. When the project is completed, it should be fully inspected and repaired.