1) Firstly, put the aerial suspended cradle on the ground, hen loosen the four wire ropes of the lifting cradle, fold up the bracket, move it horizontally to another working surface, fix the wire rope and then lift it to a certain height according to the requirements, thus completing a shift process.
2) When the hanging basket is suspended in the air, shift the roof supporting structure. After the roof supporting system is completely fixed, the operator can board the working cradle. This method is generally used when the ground conditions are more complex, when the suspension support system allows.
3) Replace the wire rope at one end of the hanging cradle with a rope on the roof, and make the weight of this side of the hanging cradle be borne by the temporary wire rope. The roof support system on this side is moved to the designated position and fixed. Then the climbing wire rope is drawn tight to loosen the temporary wire rope. Then use the same method to complete the other end of the displacement, to move it to the new construction site.