Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
Type: |
Array |



China
Long Term
2019-11-19 21:22
Scan By Phone



Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
Type: |
Array |
PLC G24 LED bulb
Parameter:
| Code | Wattage | Lumen | LED | Size |
| 2G11-2835-8W | 8W | 700lm | 40Pcs SMD2835 | 38x277mm |
| 2G11-2835-12W | 12W | 1050lm | 60Pcs SMD2835 | 38x322mm |
| 2G11-2835-15W | 15W | 1300lm | 80Pcs SMD2835 | 38x417mm |
| 2G11-2835-18W | 18W | 1600lm | 92Pcs SMD2835 | 38x542mm |
| 2G11-2835-22W | 22W | 2000lm | 112Pcs SMD2835 | 38x542mm |
Features
1. Feature:
A. Lifespan: more than 30,000hr;
B. Indoor lighting for domestic using;
C. Fast light brighting,no dely and flicker;
D. Energy-saving: saving 80% than the ordinary lamp;
E. Green and health protection,no pollutio,more comfortable for our vision.
2. Advantages:
A. Passed EMC,LVD and ROHS certification;
B. Environment-friendly and no UV or IR radiation;
C. Easy to install and maintain,replacement of traditional bulbs and no subsidiary fixture.
3. Application :
A. Generally matching in downlight, celling light, household lighting etc;
B. Shopping, lighting, specialty lighting, hotel lighting, office lighting, home light;
C. Commercial show windows and bars, airport, subway, cloverleaf junction and architecture field.
4. Cautions:
A. Switch off the power before replacing lamp;
B. Keep away from direct sunshine and high temperature;
C. If any doubt about installation or use of this product consult competent electrical
Certification


Package: 1pc/white box
Shipping: By air ,By ship or By express
Workshop
| Production line | 4 lines |
| Product Range | LED Source, LED commercial lamp, LED outdoor lamp |
| Main markets | Eastern Europe , Western Europe ,North Europe,Southern America,Latin America |
| Fair | HKTDC Hong Kong International Lighting Fair (Spring Edition) 2014 23th International Trade Show Of Lighting Equipment Light 2015 |

Any inquiry will be reply within 24 hours
OEM, ODM is avaliable
Samples will be supplied within 7 days
Quality and delivery day is controlled strickly
Price Term : FOB , CIF ,EXW
Payment Term : 30% deposit , 70% before shipment
Lead time :10-25 days
Customer Reviews total 0 items