Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |



China
Long Term
2019-10-16 20:37
Scan By Phone



Brand: |
none |
Address: |
China |
Min.Order: |
none |
Supply: |
none |
Valid until: |
Long Term |
| Quantity(Sets) | 1 - 1 | >1 |
| Est. Time(days) | 7 | To be negotiated |
Concrete Hydraulic static press pile machine/guardrail post pile driver
Model | Double power head pile driver |
Spiral drilling machine diameter | 150-600mm |
Spiral drilling depth | 3000mm |
Drilling diameter | 76-450mm |
drilling depth | 0-200m |
Mpa working pressure | 0.7-1.6 medium pressure 1.6-2.46 high pressure |
drilling pipe diameter | 60-76-89mm |
overall dimension | 4.6*2.2*2.7m |
Machine weight | 6.5T |
Concrete Hydraulic static press pile machine/guardrail post pile driver

Concrete Hydraulic static press pile machine/guardrail post pile driver
Product Application
1.HW crawler hydraulic drilling rig, using a new hydraulic technology, low consumption, large rotary torque,move the hole and shift the position is convenient.
2.The drilling rig structure is compact, it has a telescopic compensation function when promoting the slide carriage, the slide carriage supported on the ground when drilling, the drilling stability is very good.
3.The drilling rig is mainly used for piling anchoring, well ,photovoltaic solar rotating pile and water conservancy, power plants, open-air mining, road construction and other stonework blast hole drilling and so on.
Concrete Hydraulic static press pile machine/guardrail post pile driver

Hammer :75#

Hydraulic systerm


hydraulic leg

Diesel engine 85KW
Concrete Hydraulic static press pile machine/guardrail post pile driver
Concrete Hydraulic static press pile machine/guardrail post pile driver
Packing Details : 20 feet container
Delivery Details : 7 days





Concrete Hydraulic static press pile machine/guardrail post pile driver
Concrete Hydraulic static press pile machine/guardrail post pile driver




Concrete Hydraulic static press pile machine/guardrail post pile driver

Concrete Hydraulic static press pile machine/guardrail post pile driver
Concrete Hydraulic static press pile machine/guardrail post pile driver



Concrete Hydraulic static press pile machine/guardrail post pile driver
Concrete Hydraulic static press pile machine/guardrail post pile driver
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:
Concrete Hydraulic static press pile machine/guardrail post pile driver
Email: hw002(at)hengwanggk.com
Skype : hengwangaggy
Wechat/Whatsapp:+8613508973211
Whatsapp:+8613508973211
QQ: 2853024707
Mobile:+8613508973211
Customer Reviews total 0 items