100 Set/Sets per Month Loader modified hole digger machine
Packaging & Delivery
Packaging Details
Wooden case
Port
Qingdao Tianjin or Shanghai Port
Lead Time:
Quantity(Sets)
1 - 1
>1
Est. Time(days)
5
To be negotiated
Introduction of drilling rig
1. For the construction of pile driving, real estate foundation pile. 2. Solar photovoltaic pile, pile driving. 3. Highway guardrail installation, pile driving, drilling. 4. The fruit trees of agriculture are planted and dig holes.
Parameter
Specification For Loader Modified Hole Digger Machine
Customer Reviews total 0 items