1.Payment: T/T , 30% deposits before production, 70% balance to be paid before dleiverying
2.Production lead time for 100~500pcs: 10days, 500~1000pcs:15days
3.Sample can be delivered in 1-3days
Warning for applications:
1.No ballast is needed. Any ballast should be removed before installation!
2.The lamp is not water-proof.
3.The socket temperature peak is 65 degree, do not touch the aluminum or any part while working.
4.The product cannot be discarded into garbage can directly, necessary measures should be done for full recycling. 5.All installation, maintenance, dismantling should be done by licensed technician.
Customer Reviews total 0 items