175-265V 100W/150W/200w high bay led light ip44 mining lamp factory warehouse led hibay light

  • Unit Price: Negotiable
  • Brand:

  • Origin:

    China

  • Categories:Lights & Lighting
  • Validity Period:

    Long Term

  • Published on:

    2021-01-06 15:37

  • Product Description
  • Company Overview

Product Information

Brand:

none

Address:

China

Min.Order:

none

Supply:

none

Valid until:

Long Term

Product Details

175-265V 100W/150W/200w high bay led light ip44 mining lamp factory warehouse led hibay light

 

 

ITEM NO

SZX-GKD-001(GC)

Power

100W

150W

200W

Input voltage

AC175-265V,50/60Hz

AC175-265V,50/60Hz

AC175-265V,50/60Hz

Driver

Non-isolated

Non-isolated

Non-isolated

PF

≥0.6

≥0.6

≥0.6

Material

Aluminum

Aluminum

Aluminum

Beam angle

60°/90°/120°

60°/90°/120°

60°/90°/120°

IP

IP44

IP44

IP44

CRI

≥80

≥80

≥80

Size(mm)

Ø450*H280mm

Ø450*H290mm

Ø500*H300mm

LED chip

2835SMD

2835SMD

2835SMD

Lumen

100Lm/w

100Lm/w

100Lm/w

Warranty

2 years

2 years

2 years

N.W

1.4KG

1.5KG

2.1KG

FAQ

 

Q:What is your main product line is made?

A:We mainly produce led industrial lighting fixtures. Including daily life indoor lighting.( led high bay light,led high power bulb,)and outdoor lighting(led UFO high bay light,led flood light,led street light and led tower crane light)

 

 

Q:Are you factory or trading company?

A:We are a factory, we provide OEM services. Some famous foreign supermarkets and we often collaborate.

 

Q:What is the warranty for our lamps?

A:For the lamps ,we have 2 years,3years and 5 years warranty ,you can according to your requirements to chose the warranty.

 

 

Q:How do you ensure the quality?

A:We get three QC processes:1.For raw materials; 2.During the half of production; 3.Final QC test one by one after aging 24 hours.

 

 

Q:OEM or ODM accepted?

A:Yes,we can do OEM & ODM,logo on the light or package both are available.

 

Q:Can we get support if we have our own market position?

A:Please inform us your detailed market demand,we will discuss and propose helpful suggestion for you,to find the best solution for you.

 

 

Q:How many days will samples be finished?And how about the mass production?

 

A:Generally 7-10 days for samples making. The leading time of mass production will depend on the quantity.

Send your message to this supplier
* Inquiry Title
* Content
* E-mail
* Security Question

Customer Reviews total 0 items

For product pricing, customiztion, or other inquiries

Contact Supplier

Links